Delaware, OH Call the crew: (740) 555-0100
Home Cost Guide About FAQ Contact Call (740) 555-0100

Bathroom Remodeling, Delaware County

Bathroom Remodeling in Delaware, OH, Done in One Day

We are a bath-only crew. That is all we install, and it is why we can do it fast: most of our shower and tub projects in Delaware are measured, built to fit, and installed in a single day, with a written flat quote before we start.

No weeks of dust, no parade of subcontractors, no surprise change orders. One crew, one day, one price in writing. Prefer to talk it through first? Call us at (740) 555-0100.

Install Day, At a Glance

  1. Crew arrives and protects floorsDrop cloths down, water shut off, bathroom sealed off from the rest of the house.
  2. Old tub and surround outDemo is contained and the old unit is hauled away the same morning.
  3. New shower system set and sealedBase, wall panels, valve, and fixtures installed on the prepared plumbing.
  4. Final walkthroughWe test everything together, clean up, and your shower is ready to use tomorrow.
Work Order / Free Estimate NO. HB-2026

Tell us what you want changed. We call back with a time for your free in-home design consultation.


We call back from (740) 555-0100.

Free in-home design consultation
Most installs finished in one day
Written flat quote before we start
Local Delaware County crew

01 / Services

Five Jobs. One Crew. Spec'd Before We Quote.

Every project starts with measurements and a materials list, so the price we write down is the price you pay. Typical installed ranges for Delaware County homes:

02 / The System

Built to a Spec Sheet, Not to a Guess

One-day installs work because nothing is improvised on site. Your system is measured twice, cut to fit before install day, and assembled from the same materials list on every job:

Materials Spec, Standard Install
Component / Specification
Wall SystemCross-linked acrylic panels, non-porous, grout-free, cut to your exact wall dimensions.
Shower BaseSolid-surface base with a low-threshold entry and a slip-resistant finish.
Grab-Bar BlockingSolid lumber blocking set inside the wall, so bars anchor to structure, not drywall.
ValvePressure-balanced, anti-scald valve with a new trim kit matched to your fixtures.
SealantMold-resistant silicone at every seam, color matched to the wall system.
FixturesYour pick from the finish sheet at the design visit: shower head, handheld, and controls.
PHOTO: Installer fitting an acrylic wall panel over grab-bar blocking, mid-install

03 / Install Day

One Day, Hour by Hour

This is the actual schedule our crews run on a standard conversion in Delaware County. Your written quote includes the same timeline for your home.

Arrival and protectionFloors covered, furniture nearest the bath moved or masked, water shut off at the main.
DemoOld tub, surround, and fixtures removed. Plumbing inspected while the walls are open.
Rough-inNew valve set, drain aligned to the solid-surface base, grab-bar blocking framed in.
System set and sealedBase leveled, wall panels bonded, every seam sealed with mold-resistant silicone.
Fixtures and glassShower head, handheld, controls, grab bars, and glass or curtain rod installed.
Walkthrough and cleanupWe run the water with you, confirm everything drains and seals, and haul all debris out.

04 / Cost

What It Costs in Delaware County

Most of our tub-to-shower conversions land in the $9,000 to $15,000 range, and most full wet-area remodels land in the $8,000 to $16,000 range. Where your project falls depends on three things: the size of the wet area, the fixtures you pick, and what we find behind the old surround. Your flat quote, in writing, answers all three before any work begins.

Tub-to-Shower Conversion

$9,000–$15,000

Demo, new base and walls, valve, fixtures, and glass or curtain setup, installed in one day.

Shower Remodel

$7,500–$13,000

Existing shower rebuilt with a new wall system, base, and fixtures. No layout changes.

Walk-In Tub

$11,000–$19,000

Seated tub with watertight door, grab bars, and handheld shower, plus the surround refresh.

05 / Questions

Asked at Almost Every Design Visit

Can a real remodel honestly be finished in one day?+

Yes, for the wet area we specialize in. The system is measured and built to fit before install day, so the crew is assembling, not fabricating. Full-room remodels with tile, drywall, and layout changes take longer, and we will tell you that plainly at the design visit rather than promise a day we cannot keep.

Do you tear out my whole bathroom?+

No. We work inside the existing tub or shower footprint. Your floor, vanity, and toilet stay put unless you ask us to quote them separately. That focus is exactly what keeps the job to one day and keeps the price where we quoted it.

What does the free design consultation include?+

Measurements, a look at your plumbing access, the finish and fixture sheet, and a written flat quote that holds. There is no obligation and no pressure to sign the same day. Book it by calling (740) 555-0100 or sending the work order form above.

Your new shower could be in before dinner tomorrow.

Call (740) 555-0100